alb10688538

New Harbor Bridge construction, Corpus Christi, Texas, USA

New Harbor Bridge construction, crosses the Corpus Christi Ship Channel which serves the port of Corpus Christi, Six-lane cable-stay, concrete-segmental bridge, Rising to a height of 163 metres at the peak, two box girders. Completion is estimate Spring 2022. Worker suspended with extended power lift, cleaning cement joints under the bridge, Corpus Christi, Texas, Nueces County, USA.
Share
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Add to another lightbox

Add to another lightbox

add to lightbox print share
Do you already have an account? Sign in
You do not have an account? Register
Buy this image
Loading...
Title:
New Harbor Bridge construction, Corpus Christi, Texas, USA
Caption:
New Harbor Bridge construction, crosses the Corpus Christi Ship Channel which serves the port of Corpus Christi, Six-lane cable-stay, concrete-segmental bridge, Rising to a height of 163 metres at the peak, two box girders. Completion is estimate Spring 2022. Worker suspended with extended power lift, cleaning cement joints under the bridge, Corpus Christi, Texas, Nueces County, USA.
Credit:
Album / Science Source / Inga Spence
Releases:
Model: No - Property: No
Rights questions?
Image size:
5445 x 3632 px | 56.6 MB
Print size:
46.1 x 30.8 cm | 18.1 x 12.1 in (300 dpi)
Keywords:
AMERICA AMERICAN ARCHITECTURE ARTICULATION BEAM BEAMS BOX BRIDGE CABLE CEMENT CHRISTI CITY CLEANING COAST COASTAL CONCRETE CONSTRUCTION CORPUS COUNTY CRANE CRÂNES DEEP DEPARTMENT EXTENDED FOOTPATH GANTRY GENTRY GIRDER GIRDERS GULF HARBOR HARBOUR HIGHWAY JOISTS LANE LIFT MAN MASSIVE MEN MEXICO MODULAR NEW NORTH NUECES PILLARS PORT POWER PYLONS RAFTERS ROAD ROADWAY SEGMENTS SIX SPAN STATES STAY STRUCTURE SUSPENDED SUSPENSION TEXAS TIMBERWORK TOWER TOWERS TRAFFIC TRANSPORTATION TWO UNITED US USA VEHICLE WATER WORKER