alb3624012

ROBERT CHARLES DUDLEY. Valentia in 1857-1858 at the Time of the Laying of the Former Cable

Valentia in 1857-1858 at the Time of the Laying of the Former Cable. Artist: Robert Charles Dudley (British, 1826-1909). Dimensions: Sheet: 6 3/4 x 10 1/16 in. (17.2 x 25.5 cm). Date: 1865.
One of the 19th century's great technological achievements was to lay a telegraphic cable beneath the Atlantic, allowing messages to speed back and forth between North America and Europe in minutes, rather than ten or twelve days by steamer. An initially successful attempt in 1858, led by Cyrus W. Field and financed by the Atlantic Telegraph Company, failed after three weeks. Two working cables were finally laid in July and September 1866, the result of repeated efforts by the indefatigable Field, a cadre of engineers, technicians, and sailors, two groups of financial backers, and significant help from the British and United States navies. Dudley documented the process in a series of watercolors and oils, this example showing the Irish coast near the site selected in 1857 for the cable to enter the ocean from the east. In 1892 Field donated art works by Dudley, commemorative medals, memorabilia, and specimens of cable to the Museum.
Share
pinterestPinterest
twitterTwitter
facebookFacebook
emailEmail

Add to another lightbox

Add to another lightbox

add to lightbox print share
Do you already have an account? Sign in
You do not have an account? Register
Buy this image
Title:
Valentia in 1857-1858 at the Time of the Laying of the Former Cable
Caption:
Valentia in 1857-1858 at the Time of the Laying of the Former Cable. Artist: Robert Charles Dudley (British, 1826-1909). Dimensions: Sheet: 6 3/4 x 10 1/16 in. (17.2 x 25.5 cm). Date: 1865. One of the 19th century's great technological achievements was to lay a telegraphic cable beneath the Atlantic, allowing messages to speed back and forth between North America and Europe in minutes, rather than ten or twelve days by steamer. An initially successful attempt in 1858, led by Cyrus W. Field and financed by the Atlantic Telegraph Company, failed after three weeks. Two working cables were finally laid in July and September 1866, the result of repeated efforts by the indefatigable Field, a cadre of engineers, technicians, and sailors, two groups of financial backers, and significant help from the British and United States navies. Dudley documented the process in a series of watercolors and oils, this example showing the Irish coast near the site selected in 1857 for the cable to enter the ocean from the east. In 1892 Field donated art works by Dudley, commemorative medals, memorabilia, and specimens of cable to the Museum.
Technique/material:
Watercolor over graphite with touches of gouache
Museum:
Metropolitan Museum of Art, New York, USA
Credit:
Album / Metropolitan Museum of Art, NY
Releases:
Model: No - Property: No
Rights questions?
Image size:
3991 x 2708 px | 30.9 MB
Print size:
33.8 x 22.9 cm | 13.3 x 9.0 in (300 dpi)