Caption:
A Pickfords low loader transporting a W90 walking dragline excavator across the Tyne Bridge on its journey to Whitley Bay opencast coal site. This photograph is part of a batch showing a Ransome Rapier W90 walking dragline excavator being transported through the streets of Newcastle-upon-Tyne. It was on a 280 mile journey from one Laing contract at Carrington Coppice opencast coal mine in Derbyshire to another at Whitley Bay opencast coal mine.